Our process
Our process in six steps.
Nothing here should surprise you. This is the whole sequence, what we do at each point, and the short list of things we need from you.
- 1
Step One
Energy audit
We come and count what you use.
Every appliance logged, every load measured, your bill and your fuel receipts read against what the building actually draws. We measure the roof and photograph the cable run while we are there. Under two hours in most homes.
- 2
Step Two
System design
Sized from your numbers.
Panel count, inverter rating, battery bank and expected daily output, written down with a fixed quote. If the sums do not work, we say so instead of selling you a system.
- 3
Step Three
Supply
Equipment on site.
Tier-1 panels, inverters and batteries with warranty documents in your name. We check serial numbers against the quote before anything goes up.
- 4
Step Four
Installation
One to two days.
Mounting, panels, DC and AC runs, inverter and battery bank. Our own crew does the work, not a subcontractor you have never met.
- 5
Step Five
Commissioning
Tested, then handed over.
Full load test, changeover proven against a real outage, and a walk-through with whoever will operate it. You keep the manuals and the monitoring login.
Step Six
Monitoring and maintenance
It stays our problem.
Remote monitoring from day one, scheduled servicing, and a 24/7 line. We call you when output drops, before you notice.
Your side of it
What we need from you.
Six things, and the first one matters more than the rest. Your bills and fuel receipts tell us what you actually spend. Estimates come in low every time.
- 01Your last three months of bills and fuel receipts
- 02A list of what must stay on during an outage
- 03Roof and meter access on audit day
- 04Someone on site during installation
- 05DisCo account details, if you are staying grid-tied
- 06A dry, ventilated spot for the battery bank


Timing
How long the whole thing takes.
A straightforward home job runs two to three weeks from your first call to a system that is running. Most of that is equipment and scheduling rather than work on site.
- Audit booked
- Within 48 hours of your call
- Design and quote
- 3 to 5 working days after the audit
- Equipment on site
- Depends on stock. We tell you at quote
- Installation
- One to two days
- Commissioning
- Same day as the install, in most cases
Step one is free.
The energy audit costs you nothing, and you keep the findings whether or not you use us.